top of page
Gurara Transmission 2.jpg

ENVIRONMENTAL STUDIES AND MANAGEMENT

Gurara Transmission 1.jpg

Project Title: Environmental Impact Assessment (EIA) of Proposed Gurara Phase II Power Transmission Line Project in Niger State.

​

Project Description: The project entailed preparation of an EIA for the proposed Gurara Phase II Power Transmission Line in Niger State, Nigeria. The project is a 30 km dual-circuit 132 kV power transmission line that will evacuate electricity to be generated from the proposed 360 MW hydropower plant component of the Gurara Phase II Multipurpose Dam Project. 

 

Project Location: Niger State, Nigeria. 

 

Client: Federal Ministry of Water Resources (FMWR), Nigeria.

​

Status: Ongoing

Gurara Transmission 3.jpg
bottom of page